Provide customers with solutions in terms of improving power quality, optimizing control, and energy saving and consumption reduction.
Improving power quality and optimizing control
Liaoning Rongxin Xingye Power Technology Co., Ltd. is committed to becoming a reliable partner of customers through honest management. In order to continuously improve the service quality.
Rongxin Xingye is taking "Rongxin" as the foundation and "Xingye" as its mission, using the wisdom and diligence from China to provide global customers with high-quality products and services to achieve green life and sustainable development.
Read more >"Rongrong grass and trees, longevity of faith", Rongxin Xingye advocates a green lifestyle
Focus on energy efficiency and achieve sustainable social development with high-quality products, services and solutions.
Focusing on the development goals of the company's strategic planning, absorbing the essence of corporate culture, and creating a sound, efficient and innovative human resource system.
Liaoning Rongxin Xingye Power Technology Co., Ltd. was established in March 2017. It is a high-tech enterprise focusing on the manufacture of energy-saving and high-power power electronic equipment.
Qingdao Sifang Bombardier railway transportation equipment Co., Ltd. uses RongxinXingye SVG (hereinafter referred to as subsynchronous oscillation suppressor) with subsynchronous oscillation suppression function. The primary topology of the site is as follows:
The subsynchronous oscillation suppressor supplies power to multiple modules through 27.5/0.5kV step-down transformer. By detecting the load harmonic current, the controller makes the module output the harmonic current with the same amplitude and opposite phase to the load harmonic current, so as to achieve the suppression of the grid side harmonic current, and moreover suppress the sub synchronous resonance of the locomotive.
Before and after the subsynchronous oscillation suppressor is put into operation, the field measurement results are as follows
1. Pantograph raising test of eight CHRi EMUs at the same time
When the subsynchronous oscillation suppressor is not put into operation, serious subsynchronous oscillation occurs in the power grid, and the locomotive can not work normally (below left figure). When the subsynchronous oscillation suppressor is put into operation, the grid voltage and current have no obvious fluctuation, and the locomotive works normally (below right figure).
2.13 CRHi EMUs pantograph raising test at the same time
When the subsynchronous oscillation suppressor is put into operation, the voltage and current of the power grid and the waveform of the oscillation suppressor are recorded, and there is no obvious fluctuation of the power grid voltage and current.
To sum up, when the subsynchronous oscillation suppressor is not put into operation, serious subsynchronous oscillation will occur in the power grid when 8 CRHi EMUs are subjected to pantograph raising test at the same time, leading to locomotive failure. When the oscillation suppressor is put into operation and 13 CRHi EMUs are tested with pantograph rising at the same time, the grid voltage and current have no obvious fluctuation and the locomotive works normally. Therefore, the subsynchronous oscillation suppressor can effectively solve the subsynchronous oscillation problem of locomotive traction transformer.
No. 108, Keji Road, Lishan District, Anshan City, Liaoning Province
+86 4127260721 overseas@lylsm.cn Business license
Copyright 2025 lylsm.cn | All rights Reseved